Topping-out ceremony for the Schönwalde Elementary School on Bernauer Damm
Four months after the groundbreaking ceremony, the municipality of Wandlitz celebrated the topping-out ceremony for the new Schönwalde Elementary School. The project is right on schedule. The modern school campus, designed for 540 students, is scheduled to open for the 2027–2028 school year.
With the shell of the building complete, waterproofing work is in full swing. Facade and roofing work is also well underway, meaning the building will soon be fully winter-ready. The geothermal drilling, which ensures climate-friendly heating, has also been completed—the connection will take place in spring 2026.
The new building is designed for climate-friendly operation and sets new standards in energy efficiency and sustainability with geothermal heating, a wood facade, a green roof, and a photovoltaic system. The project is aligned with the criteria of the Sustainable Building Assessment System (BNB) and aims for Silver certification.
Prior to the topping-out ceremony, interested residents were able to tour the building as part of a construction site tour.
Project Overview
Planning for the Schönwalde Elementary School began in 2019. Following an architectural competition in 2021 and preparatory work in late 2024, construction began in the spring of 2025. The new building comprises approximately 4,600 m² of floor space as well as a 1,500 m² two-court sports hall. In total, the municipality is investing around 37 million euros in the project, which includes not only the school building but also the sports facilities, outdoor areas, a bus turnaround loop, and public open spaces.
Client: Municipality of Wandlitz
Architects: Pussert Kosch Architekten
Structural engineering by MVD